Avtovo CHP-15 provides electric and thermal energy to the Admiralteisky, Moskovsky, Kirovsky and Krasnoselsky Districts of St. Petersburg. The director of station is Alexander Sidorov.〔 〕 == History == It began operation on December 26, 1956.〔 Initially the station used coal, but towards the end of the 20th century TGC-1 began converting to gas. In connection with development of a gas powered station, physical deterioration and equipment obsolescence, reconstruction began in 2000 at the station.〔 * In 2000 the turbine unit number 3 was replaced. * On December 28, 2007 the new turbine unit number 2, with an electric capacity of 30 MW, and thermal capacity of 75 GCal/h, began operation. Also the transformers and generator were replaced.〔〔 On August 23, 2009 there was a fire in the repaired unit. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Avtovo CHP-15」の詳細全文を読む スポンサード リンク
|